Monitoring production Lead Time

Hi Mark,

Thanks a lot for your message and for sharing your very interesting thoughts !

To answer your questions, I would like to measure both Client LeadTime and Process LeadTime.
My objective in measuring process leadtime is for performance analysis. We try to have the shortest leadtime between two operations (product waiting time before process).
It could be a way to challenge our operators team in the shopfloor. And also to check if the FIFO is respected (but for this maybe no need to have the shopfloor opening hours).

I tried to install the Custome Widget from Pete Get working hours between two dates and times but I didn’t managed to do it. If you have any ideas why, I’m interested.

Do you know if there will be updates on the “Schedule and shifts” tool in the future ?
Maybe it could be a way to answer my use case for Process LeadTime.

Thanks,
Paul